Yes, if there are holes in the joint, they will be produced before the mold is changed (it will not be produced in the future), and the sealing ring with smaller size is needed; if there is no hole, it should be equipped with a thicker sealing ring, which is the kind of goods to be delivered later.<br>
正在翻译中..