The igt project plans to install a set of cranes, so after preliminary discussions, it was decided to swap the existing DXR production line with the IGT production line
The igt project planned to install a set of vehicles, so after preliminary discussions it was decided to swap the existing DXR production lines with the IGT lines
IGT project plans to install a set of traveling crane, so after preliminary discussion, it is decided to exchange the existing DXR production line with IGT production line<br>