原在使用的量具固定资产损坏后补货刀具吧根据公司的产品加工计划决定是否补货,如需补货,则把补货的的型号、规格,编制技术要求及验收要求将需求及申的英语翻译

原在使用的量具固定资产损坏后补货刀具吧根据公司的产品加工计划决定是否补

原在使用的量具固定资产损坏后补货刀具吧根据公司的产品加工计划决定是否补货,如需补货,则把补货的的型号、规格,编制技术要求及验收要求将需求及申请理由提出购买需求,经相关负责人确信后发给设备维护部门固定资产专员,固定资产专员及时提交P&E申请,跟踪直到审批完成。5.2.1.3固定资产到货后,采购员通知设备固定资产专员收货,收货后按照合同和购买时提出的验收要求通知相关部门和人员进行验收,验收合格后新增加型号的量具,由计量室编写量具编号,并且在量具管理系统内建立相关信息,之后将实物移交给刀具吧 。5.2.2费用类量具的申请购买、采购、入库5.2.2.1在使用的量具报废或因产能增加现有库存量具无法满足现场使用需求,由刀具吧量具计划员根据公司产品加工计划、现有的量具库存编制量具采购计划,定期由刀具吧统一提交购买PR。5.2.2.2对于新增品种的量具,各需求部门在公用盘
0/5000
源语言: -
目标语言: -
结果 (英语) 1: [复制]
复制成功!
After the fixed assets of the measuring tool used are damaged, replenish the <br><br>knives according to the company's product processing plan to decide whether to replenish. Propose purchase requirements and send them to the fixed asset specialist of the equipment maintenance department after the responsible person is convinced. The fixed asset specialist submits the P & E application in time and tracks until the approval is completed. <br>5.2.1.3 After the fixed assets arrive, the buyer informs the equipment fixed asset commissioner to receive the goods. After receiving the goods, the relevant departments and personnel are notified in accordance with the contract and the acceptance requirements at the time of purchase. The laboratory compiles the gage number, and establishes the relevant information in the gage management system, and then transfers the real object to the tool. <br>5.2.2 Application for purchase, purchase and storage of expense gauges <br>5.2.2.1 The gauges in use are scrapped or the existing inventory gauges cannot meet the needs of on-site use due to the increase in production capacity. Gage inventory is prepared for the gage purchase plan, and the tool bar regularly submits the purchase PR. <br>5.2.2.2 For the new varieties of measuring tools, each demand department is in the common disk
正在翻译中..
结果 (英语) 2:[复制]
复制成功!
原在使用的量具固定资产损坏后补货<br><br>刀具吧根据公司的产品加工计划决定是否补货,如需补货,则把补货的的型号、规格,编制技术要求及验收要求将需求及申请理由提出购买需求,经相关负责人确信后发给设备维护部门固定资产专员,固定资产专员及时提交P&E申请,跟踪直到审批完成。<br>5.2.1.3固定资产到货后,采购员通知设备固定资产专员收货,收货后按照合同和购买时提出的验收要求通知相关部门和人员进行验收,验收合格后新增加型号的量具,由计量室编写量具编号,并且在量具管理系统内建立相关信息,之后将实物移交给刀具吧 。<br>5.2.2费用类量具的申请购买、采购、入库<br>5.2.2.1在使用的量具报废或因产能增加现有库存量具无法满足现场使用需求,由刀具吧量具计划员根据公司产品加工计划、现有的量具库存编制量具采购计划,定期由刀具吧统一提交购买PR。<br>5.2.2.2对于新增品种的量具,各需求部门在公用盘
正在翻译中..
结果 (英语) 3:[复制]
复制成功!
Replenishment after damage to the fixed assets of the measuring tools originally in use<br>The tool bar decides whether to replenish according to the company's product processing plan. If replenishment is needed, the model and specification of replenishment, technical requirements and acceptance requirements shall be prepared, and the demand and application reason shall be put forward for purchase. After being confirmed by the relevant person in charge, it shall be sent to the fixed assets specialist of the equipment maintenance department. The fixed assets specialist shall submit the P & e application in a timely manner and track until the approval is completed.<br>5.2.1.3 after the arrival of the fixed assets, the buyer shall inform the equipment fixed assets specialist to receive the goods. After receiving the goods, the buyer shall inform the relevant departments and personnel to carry out the acceptance according to the contract and the acceptance requirements put forward at the time of purchase. After the acceptance is qualified, a new type of measuring tool shall be added. The measuring room shall prepare the measuring tool number, and establish the relevant information in the measuring tool management system, and then hand over the physical object to the cutter.<br>5.2.2 application for purchase, purchase and warehousing of expense measuring tools<br>5.2.2.1 if the measuring tools in use are scrapped or the existing inventory of measuring tools cannot meet the demand of site use due to the increase of production capacity, the tool bar measuring tool Planner shall prepare the purchasing plan of measuring tools according to the company's product processing plan and the existing measuring tool inventory, and the tool bar shall submit the purchasing PR uniformly on a regular basis.<br>5.2.2.2 for the measuring tools of new varieties, each demand department shall use the common plate<br>
正在翻译中..
 
其它语言
本翻译工具支持: 世界语, 丹麦语, 乌克兰语, 乌兹别克语, 乌尔都语, 亚美尼亚语, 伊博语, 俄语, 保加利亚语, 信德语, 修纳语, 僧伽罗语, 克林贡语, 克罗地亚语, 冰岛语, 加利西亚语, 加泰罗尼亚语, 匈牙利语, 南非祖鲁语, 南非科萨语, 卡纳达语, 卢旺达语, 卢森堡语, 印地语, 印尼巽他语, 印尼爪哇语, 印尼语, 古吉拉特语, 吉尔吉斯语, 哈萨克语, 土库曼语, 土耳其语, 塔吉克语, 塞尔维亚语, 塞索托语, 夏威夷语, 奥利亚语, 威尔士语, 孟加拉语, 宿务语, 尼泊尔语, 巴斯克语, 布尔语(南非荷兰语), 希伯来语, 希腊语, 库尔德语, 弗里西语, 德语, 意大利语, 意第绪语, 拉丁语, 拉脱维亚语, 挪威语, 捷克语, 斯洛伐克语, 斯洛文尼亚语, 斯瓦希里语, 旁遮普语, 日语, 普什图语, 格鲁吉亚语, 毛利语, 法语, 波兰语, 波斯尼亚语, 波斯语, 泰卢固语, 泰米尔语, 泰语, 海地克里奥尔语, 爱尔兰语, 爱沙尼亚语, 瑞典语, 白俄罗斯语, 科西嘉语, 立陶宛语, 简体中文, 索马里语, 繁体中文, 约鲁巴语, 维吾尔语, 缅甸语, 罗马尼亚语, 老挝语, 自动识别, 芬兰语, 苏格兰盖尔语, 苗语, 英语, 荷兰语, 菲律宾语, 萨摩亚语, 葡萄牙语, 蒙古语, 西班牙语, 豪萨语, 越南语, 阿塞拜疆语, 阿姆哈拉语, 阿尔巴尼亚语, 阿拉伯语, 鞑靼语, 韩语, 马其顿语, 马尔加什语, 马拉地语, 马拉雅拉姆语, 马来语, 马耳他语, 高棉语, 齐切瓦语, 等语言的翻译.

Copyright ©2024 I Love Translation. All reserved.

E-mail: