Before welding, the welding parts shall be spot fixed. The sequence and position of spot welding are as follows: firstly, four corners shall be fixed, and then the four end faces shall be fixed. The length and spacing of spot welding are as follows: spot welding is carried out by 100 mm every 200 mm.<br>
正在翻译中..