With the large-scale port construction, the breakwater project gradually to the deep water development, but by the sea cover conditions are poor, the operation surface is narrow, the impact of wind and waves, the use of large stone square smaller and other adverse conditions, the construction is becoming more and more difficult. In this paper, taking a breakwater embankment project in Rizhao Port as an example, according to the type of the main structure of the vertical embankment head with the slope embankment structure and large tank, combined with the natural conditions and construction characteristics of the project, the paper focuses on the detailed discussion of the operation and installation technology of the embankment head section of the breakwater project, and formulates effective measures to guide the practice, ensure the progress of the project, The construction quality and safety meet the expected requirements.