3. The main body is dismantled to make the space more practical<br>The demolition and reconstruction of the main body is the first project, mainly including the demolition of walls, building walls, shoveling wall skins, demolition of heating, replacement of plastic steel windows, etc. The removed and modified garbage shall be cleaned out in time to ensure the indoor cleanness, which is also for the convenience of construction. At this time, it's time to fix the finished door. At this time, it's best to stroll through the cupboard, range hood, stove and water heater, and try to make sure.<br>4. Water and electricity transformation, arrange the use of each space<br>Water and electricity transformation is the most important link, we must determine the exact location of switches, lamps, basins, bathtubs, washing machines and so on. Before the transformation of water and electricity, the cabinet designer should carry out the first measurement at the door to help you determine the transformation plan of power supply and water circuit. For water heater, it is better to send someone to design the position of power supply, water inlet and water outlet according to the model determined by you. Reminder: on the wall under the water basin, it's better to leave a power socket for the convenience of installing kitchen treasures. The air conditioning hole and power supply should be placed on the wall at the head of the bed as far as possible, so as to avoid the air conditioning blowing directly at people in the future. Keep a distance of 20cm between strong electricity and weak points. For example, keep a distance of 20cm between socket and network cable.<br>
正在翻译中..