After the deviation occurred, the water system immediately organized personnel to carry out maintenance, fastening and clamping, which was completed at 10: 30 am on January 27, 2021 (it took 20 minutes), and there was no leakage after that. After that, contact the maintenance personnel to re-weld and install the pipeline support frame, which was completed at 2: 00 pm on January 27, 2021. The preparation pipelines of Y61 purified water system are all closed pipelines, and the secondary RO production water pipeline is positive pressure, which will not cause pollution caused by external air entering the pipeline due to leakage, that is, it has no impact on the water quality of Y61 purified water system.