During the preparation of this design, the project management organization, overall construction arrangement, construction preparation, construction methods of main divisional and subdivisional works, engineering quality assurance measures, safety and civilized construction measures, construction site management measures and other factors shall be fully considered as much as possible, highlighting the scientificity, applicability and pertinence, so as to ensure high-quality, low consumption, safety, civilization and high-speed completion.<br>