1、卷板机须由专人操作与管理。2、操作人员有必要熟悉卷板机的结构功能和运用方法。3、开机前,仔细查看安全设备是否完好无缺。4、操作时,禁止手的英语翻译

1、卷板机须由专人操作与管理。2、操作人员有必要熟悉卷板机的结构功能和

1、卷板机须由专人操作与管理。2、操作人员有必要熟悉卷板机的结构功能和运用方法。3、开机前,仔细查看安全设备是否完好无缺。4、操作时,禁止手和脚放在滚轴和传动部件及工件上。5、作业中断后,应将离合器打至空档。6、多人协同作业要有专人指挥操作。7、禁止超负荷作业。8、上辊的升降翻转轴承的倾倒、复位及上辊的平衡,须在主传动停机后进行。9、作业场所禁止乱堆工件及杂物。做到始终保持机床及车间的干净整洁。10、作业完毕,应切断电源并锁好电源箱。
0/5000
源语言: -
目标语言: -
结果 (英语) 1: [复制]
复制成功!
1, rolling machine shall hand operation and management. <br>2, the operator need to be familiar with the structure and function using the method of coiling machine. <br>3, before starting, carefully check the safety equipment is intact. <br>4, the operation is prohibited on the hands and feet and the work roller and the drive member. <br>5, after the job is interrupted, the clutch should fight to neutral. <br>6, people collaborate to have someone directing operations. <br>7, prohibit overload operation. <br>8, the pivot bearing roller lifting tilting, and reset the balance roller, shall be carried out after the main drive shutdown. <br>9, the workpiece workplace prohibition heaps and debris. Do always keep the machine clean and shop. <br>10, operation is completed, lock and cut off the power supply box.
正在翻译中..
结果 (英语) 2:[复制]
复制成功!
1, the roll machine must be operated and managed by a person.<br>2, the operator needs to be familiar with the structural functions and application of the roller machine.<br>3, before power ing-up, carefully check whether the security equipment is intact.<br>4, when operating, prohibit hands and feet on rollers and drive parts and workpieces.<br>5, after the interruption of work, the clutch should be hit to neutral.<br>6, multi-person coordination operation should have a special person command operation.<br>7, prohibit overload work.<br>8, the upper roller lift flip bearing dumping, reset and the balance of the roller, must be carried out after the main drive shutdown.<br>9, the work site is prohibited to pile up workpieces and debris. Always keep the machine tool and workshop clean and tidy.<br>10, the job is completed, should cut off the power supply and lock the power box.
正在翻译中..
结果 (英语) 3:[复制]
复制成功!
1. The rolling machine shall be operated and managed by special personnel.<br>2. It is necessary for the operator to be familiar with the structure, function and application method of the rolling machine.<br>3. Before starting the machine, carefully check whether the safety equipment is intact.<br>4. During operation, it is forbidden to place hands and feet on rollers, transmission parts and workpieces.<br>5. After the operation is interrupted, the clutch should be turned to neutral.<br>6. There should be a special person to command the operation of multi person cooperative operation.<br>7. Overload operation is prohibited.<br>8. The tilting, resetting and balancing of the lifting and turning bearing of the upper roll shall be carried out after the main drive stops.<br>9. It is forbidden to pile up workpieces and sundries in the workplace. Keep the machine tool and workshop clean and tidy at all times.<br>10. After operation, cut off the power supply and lock the power box.<br>
正在翻译中..
 
其它语言
本翻译工具支持: 世界语, 丹麦语, 乌克兰语, 乌兹别克语, 乌尔都语, 亚美尼亚语, 伊博语, 俄语, 保加利亚语, 信德语, 修纳语, 僧伽罗语, 克林贡语, 克罗地亚语, 冰岛语, 加利西亚语, 加泰罗尼亚语, 匈牙利语, 南非祖鲁语, 南非科萨语, 卡纳达语, 卢旺达语, 卢森堡语, 印地语, 印尼巽他语, 印尼爪哇语, 印尼语, 古吉拉特语, 吉尔吉斯语, 哈萨克语, 土库曼语, 土耳其语, 塔吉克语, 塞尔维亚语, 塞索托语, 夏威夷语, 奥利亚语, 威尔士语, 孟加拉语, 宿务语, 尼泊尔语, 巴斯克语, 布尔语(南非荷兰语), 希伯来语, 希腊语, 库尔德语, 弗里西语, 德语, 意大利语, 意第绪语, 拉丁语, 拉脱维亚语, 挪威语, 捷克语, 斯洛伐克语, 斯洛文尼亚语, 斯瓦希里语, 旁遮普语, 日语, 普什图语, 格鲁吉亚语, 毛利语, 法语, 波兰语, 波斯尼亚语, 波斯语, 泰卢固语, 泰米尔语, 泰语, 海地克里奥尔语, 爱尔兰语, 爱沙尼亚语, 瑞典语, 白俄罗斯语, 科西嘉语, 立陶宛语, 简体中文, 索马里语, 繁体中文, 约鲁巴语, 维吾尔语, 缅甸语, 罗马尼亚语, 老挝语, 自动识别, 芬兰语, 苏格兰盖尔语, 苗语, 英语, 荷兰语, 菲律宾语, 萨摩亚语, 葡萄牙语, 蒙古语, 西班牙语, 豪萨语, 越南语, 阿塞拜疆语, 阿姆哈拉语, 阿尔巴尼亚语, 阿拉伯语, 鞑靼语, 韩语, 马其顿语, 马尔加什语, 马拉地语, 马拉雅拉姆语, 马来语, 马耳他语, 高棉语, 齐切瓦语, 等语言的翻译.

Copyright ©2024 I Love Translation. All reserved.

E-mail: