本人自大学毕业以来,主要在水电八局从事水力发电站项目、火力发电站EPC项目、高铁项目的施工管理和项目管理工作。自1995年参加二滩项目建设起的英语翻译

本人自大学毕业以来,主要在水电八局从事水力发电站项目、火力发电站EPC

本人自大学毕业以来,主要在水电八局从事水力发电站项目、火力发电站EPC项目、高铁项目的施工管理和项目管理工作。自1995年参加二滩项目建设起,一直主要工作在国际公司国际项目上,熟悉擅长根据FIDIC条款合同施工运作模式和国际EPC项目,能熟练运用英语听说读写,先后担任部门付主任、主任、项目副经理、项目常务经理、国际公司专业总工程师等职务。
0/5000
源语言: -
目标语言: -
结果 (英语) 1: [复制]
复制成功!
Since graduating from university, I have been mainly engaged in the construction management and project management of hydropower station projects, thermal power station EPC projects, and high-speed rail projects in the Eighth Hydropower Bureau. Since participating in the construction of the Ertan project in 1995, he has been mainly working on international projects for international companies. He is familiar with the construction mode of contract construction and international EPC projects according to FIDIC clauses and is proficient in English listening, speaking, reading and writing. He has served as department director and director successively , Project deputy manager, project executive manager, professional chief engineer of international company, etc.
正在翻译中..
结果 (英语) 2:[复制]
复制成功!
Since graduating from college, I have been engaged in hydropower projects, ePC projects for coal-fired power stations, construction management and project management of high-speed rail projects. Since 1995 to participate in the construction of the Second Beach project, has been mainly working in international companies on international projects, familiar with the FIDIC terms of the contract construction mode and international EPC project, can be proficient in the use of English listening and writing, has served as the department pay director, director, project deputy manager, project executive manager, international company professional chief engineer and other positions.
正在翻译中..
结果 (英语) 3:[复制]
复制成功!
Since I graduated from University, I have been mainly engaged in the construction management and project management of hydropower station project, thermal power station EPC project and high-speed railway project in No.8 Hydropower Bureau. Since joining Ertan Project Construction in 1995, he has been mainly engaged in international projects of international companies. He is familiar with the operation mode of contract construction according to FIDIC terms and international EPC projects, and is proficient in English listening, speaking, reading and writing. He has successively held the posts of deputy director, director, deputy project manager, project executive manager and professional chief engineer of international company.<br>
正在翻译中..
 
其它语言
本翻译工具支持: 世界语, 丹麦语, 乌克兰语, 乌兹别克语, 乌尔都语, 亚美尼亚语, 伊博语, 俄语, 保加利亚语, 信德语, 修纳语, 僧伽罗语, 克林贡语, 克罗地亚语, 冰岛语, 加利西亚语, 加泰罗尼亚语, 匈牙利语, 南非祖鲁语, 南非科萨语, 卡纳达语, 卢旺达语, 卢森堡语, 印地语, 印尼巽他语, 印尼爪哇语, 印尼语, 古吉拉特语, 吉尔吉斯语, 哈萨克语, 土库曼语, 土耳其语, 塔吉克语, 塞尔维亚语, 塞索托语, 夏威夷语, 奥利亚语, 威尔士语, 孟加拉语, 宿务语, 尼泊尔语, 巴斯克语, 布尔语(南非荷兰语), 希伯来语, 希腊语, 库尔德语, 弗里西语, 德语, 意大利语, 意第绪语, 拉丁语, 拉脱维亚语, 挪威语, 捷克语, 斯洛伐克语, 斯洛文尼亚语, 斯瓦希里语, 旁遮普语, 日语, 普什图语, 格鲁吉亚语, 毛利语, 法语, 波兰语, 波斯尼亚语, 波斯语, 泰卢固语, 泰米尔语, 泰语, 海地克里奥尔语, 爱尔兰语, 爱沙尼亚语, 瑞典语, 白俄罗斯语, 科西嘉语, 立陶宛语, 简体中文, 索马里语, 繁体中文, 约鲁巴语, 维吾尔语, 缅甸语, 罗马尼亚语, 老挝语, 自动识别, 芬兰语, 苏格兰盖尔语, 苗语, 英语, 荷兰语, 菲律宾语, 萨摩亚语, 葡萄牙语, 蒙古语, 西班牙语, 豪萨语, 越南语, 阿塞拜疆语, 阿姆哈拉语, 阿尔巴尼亚语, 阿拉伯语, 鞑靼语, 韩语, 马其顿语, 马尔加什语, 马拉地语, 马拉雅拉姆语, 马来语, 马耳他语, 高棉语, 齐切瓦语, 等语言的翻译.

Copyright ©2024 I Love Translation. All reserved.

E-mail: