After the 2019 full reconstruction of the dam [1], its reservoir storage capacity curve, flood discharge facilities, installed capacity, etc. The main features of flood water level has undergone major changes.
After the reconstruction of the plump dam in 2019, the reservoir capacity curve, flood relief facilities, installation scale and flood control main characteristicwater level have all changed significantly.
After the reconstruction of Fengman dam in 2019 [1], the reservoir capacity curve, flood discharge facilities, installed capacity, flood control main characteristic water level and so on have changed significantly<br>