1. The concrete retaining wall of steel pipe pile foundation starts to be poured; the masonry facing wall is being built.<br>The steel pipe pile has been completed; the straw bag wooden pile backfilling has been completed for 3174m 3, 2680m 3 in total.<br>
正在翻译中..