业主负责组织 PMC、设计、采办、施工、运行等参建单位完成竣工验收文件

业主负责组织 PMC、设计、采办、施工、运行等参建单位完成竣工验收文件编制,主要包括: (1)竣工验收报告书; (2)竣工验收鉴定书; (3)设计总结; (4)物资采办工作总结; (5)PMC总结(6)施工总结;(7)监造总结; (8)生产准备和试运考核总结; 工程项目具备竣工验收条件后,业主组织PMC、施工单位填报竣工验收方案条件落实单(见附件),向上级部门申请竣工预验收。业主负责组织有关部门、PMC、设计单位、物资采办单位、施工单位等相关各方组成验收组,开展初步验收。初步验收的主要任务是检查和评定工程的设计和施工质量,检查竣工资料和竣工验收文件准备情况,为竣工验收做好准备。
0/5000
源语言: -
目标语言: -
结果 (英语) 1: [复制]
复制成功!
Owners responsible for organizing the PMC, design, procurement, construction, operations and other units involved to complete the final acceptance documentation, including: (1) final acceptance report; (2) the completion acceptance identification letter; (3) design summary; (4) materials procurement summary of the work; (5) PMC summary (6) construction summary; (7) supervision summary; (8) production preparation and trial operation assessment summary; project have after completion and acceptance conditions, the owners organize PMC, the construction unit reporting completed acceptance condition to implement a single program (see Annex), apply to the higher authorities completed pre-acceptance. Owner is responsible for organizing the relevant departments, PMC, the unit design, materials procurement units, construction units and other related parties consisting inspection team to carry out the preliminary acceptance. The main task of the preliminary acceptance is the design and construction quality inspection and engineering assessment, inspection and final acceptance completion data file readiness, ready for the final acceptance.
正在翻译中..
结果 (英语) 2:[复制]
复制成功!
The owner is responsible for organizing PMC, design, acquisition, construction, operation and other participating units to complete the completion of the acceptance document preparation, including: (1) completion acceptance report; (2) completion acceptance certificate; (3) design summary; (4) material acquisition work summary; (5) PMC summary (6) construction summary; (7) supervision summary; (8) Production preparation and trial transportation assessment summary; after the project has the completion acceptance conditions, the owner organizes PMC, the construction unit to fill in the completion acceptance program conditions implementation document (see annex), to apply to the higher department for pre-acceptance of the completion. The owner is responsible for organizing the relevant departments, PMC, design units, material procurement units, construction units and other relevant parties to form an acceptance group, to carry out preliminary acceptance. The main task of preliminary acceptance is to check and evaluate the design and construction quality of the project, to check the completion data and the preparation of the completion acceptance documents, and to prepare for the completion acceptance.
正在翻译中..
结果 (英语) 3:[复制]
复制成功!
The owner is responsible for organizing PMC, design, procurement, construction, operation and other participating units to complete the preparation of completion acceptance documents, mainly including: (1) completion acceptance report; (2) completion acceptance appraisal; (3) design summary; (4) material procurement work summary; (5) PMC summary (6) construction summary; (7) supervision summary; (8) production preparation and commissioning assessment summary; After the project meets the completion acceptance conditions, the owner shall organize PMC and the construction unit to fill in the completion acceptance scheme condition implementation sheet (see the appendix), and apply for the completion pre acceptance to the superior department. The owner is responsible for organizing relevant departments, PMC, design unit, material procurement unit, construction unit and other relevant parties to form an acceptance team to carry out preliminary acceptance. The main task of preliminary acceptance is to check and evaluate the design and construction quality of the project, check the preparation of completion data and completion acceptance documents, and prepare for completion acceptance.
正在翻译中..
 
其它语言
本翻译工具支持: 世界语, 丹麦语, 乌克兰语, 乌兹别克语, 乌尔都语, 亚美尼亚语, 伊博语, 俄语, 保加利亚语, 信德语, 修纳语, 僧伽罗语, 克林贡语, 克罗地亚语, 冰岛语, 加利西亚语, 加泰罗尼亚语, 匈牙利语, 南非祖鲁语, 南非科萨语, 卡纳达语, 卢旺达语, 卢森堡语, 印地语, 印尼巽他语, 印尼爪哇语, 印尼语, 古吉拉特语, 吉尔吉斯语, 哈萨克语, 土库曼语, 土耳其语, 塔吉克语, 塞尔维亚语, 塞索托语, 夏威夷语, 奥利亚语, 威尔士语, 孟加拉语, 宿务语, 尼泊尔语, 巴斯克语, 布尔语(南非荷兰语), 希伯来语, 希腊语, 库尔德语, 弗里西语, 德语, 意大利语, 意第绪语, 拉丁语, 拉脱维亚语, 挪威语, 捷克语, 斯洛伐克语, 斯洛文尼亚语, 斯瓦希里语, 旁遮普语, 日语, 普什图语, 格鲁吉亚语, 毛利语, 法语, 波兰语, 波斯尼亚语, 波斯语, 泰卢固语, 泰米尔语, 泰语, 海地克里奥尔语, 爱尔兰语, 爱沙尼亚语, 瑞典语, 白俄罗斯语, 科西嘉语, 立陶宛语, 简体中文, 索马里语, 繁体中文, 约鲁巴语, 维吾尔语, 缅甸语, 罗马尼亚语, 老挝语, 自动识别, 芬兰语, 苏格兰盖尔语, 苗语, 英语, 荷兰语, 菲律宾语, 萨摩亚语, 葡萄牙语, 蒙古语, 西班牙语, 豪萨语, 越南语, 阿塞拜疆语, 阿姆哈拉语, 阿尔巴尼亚语, 阿拉伯语, 鞑靼语, 韩语, 马其顿语, 马尔加什语, 马拉地语, 马拉雅拉姆语, 马来语, 马耳他语, 高棉语, 齐切瓦语, 等语言的翻译.

Copyright ©2024 I Love Translation. All reserved.

E-mail: