After accurate positioning of the suspect weld, the operation pit excavation, the excavation of the operation pit should continue on the basis of the pit, after the welding port positioning from the outside of the pipe 1 meter to make a marking line, marking the line outside the excavator excavation. The slope ratio of the operating pit is no greater than 1:1: the distance between the pipe and the side wall of the pit is no less than 1200mm. The bottom distance of the tube pit is greater than 500mm (the distance of the stone section is greater than or equal to 300mm), must be carried out manually, and when cleaning the soil above the weld, manual cleaning must be used. Under the operation pit, the anti-collapse shed is placed or the operation pit is reinforced with piling and support, and the axial passage smaller than 15 degrees is excavated by mechanical and manual excavation of the slope by mechanical and manual excavation at both ends of the welding port. In order to ensure the safety of the operation of the operation of the operation of the operation pit, the excavation process must have the safety personnel to supervise the side station.
正在翻译中..