When the upper roll is at the highest position, the upper roll indicator light on the touch screen is on. Then, when the touch screen turns over the interface, press the front and rear support cylinders to rise to the position (that is, when the upper limit light of the front and rear support cylinders on the touch screen is on). Press down button of balance cylinder again. That is to say, when pressing to the tail of the upper roller, the preload should be controlled at about 4-5mm, not too much! Otherwise, the tail of the upper roller will be excessively bent and the upper roller and other workpieces will be damaged. The rolling machine can turn over the rack to set the falling value of balance cylinder. The tripod can be turned over. No one is allowed to stand in front of the overturning frame (i.e. outside)!<br>Special reminder: as the foundation bolts of the new plate rolling machine chassis have not been grouted, please immediately grout. After the cement mortar is completed and solidified, screw the anchor bolt, and then the roll over / reset operation of the roll over frame of the plate machine can be carried out according to the specified procedure.<br>
正在翻译中..