3.18.3.1.3 Pipe replacement. <br>Dismantle the continuous row of electric doors, the continuous row of bypass electric doors, and the continuous row of drain pipes for heat preservation. <br>Use a thickness gauge to measure the wall thickness of the pipe and fill in Table 1. <br>If the pipe wall thickness is reduced by more than 1/3, the pipe needs to be replaced. <br>According to the on-site situation, the pipes should be equipped and the grooves should be polished. <br>Weld after the groove is qualified. <br>Contact metallographic personnel for flaw detection, and restore insulation after passing the test.
正在翻译中..