This document provides the guidelines and methods to be followed for calibration and testing of the instrument and valve bench in section C1 of the coastal No. 2 thermal power plant project. <br>Scope of project: C2 bid section includes Unit 2, steam engine room, boiler room, and desulfurization area.
正在翻译中..