It is recommended that the booster station design unit (IPC) reserve two inbound channels in the booster station to facilitate the 35kV collection line to enter the station
It is suggested that the boost station design unit (IPC) reserves two inbound channels at the boost station to facilitate the 35kV power collection line
It is suggested that the booster station Designer (IPC) reserve two access channels in the booster station to facilitate the access of 35kV collector line<br>