Connect the required parts according to figure 1. Install the qualified shear pin, the pressure gauge indicates 0, pressurize until the shear pin is cut off, read the pressure value and record, release the pressure, and conduct the next test. The safety valve shall be tested piece by piece, and the highest and lowest gear of each set shall be tested once. After the test is completed, the inspector shall fill in the safety valve blowout test report and keep it on file, and feed back the test results to the production department and the delivery group. For shear pin test, 3-5 pieces are selected for every 1000 pieces
正在翻译中..