This week a total cut-off wall pouring completed, 10m ³ <br>' <br>' <br>this week, a total of slope steel pipe piles: 142m, completed construction of steel pipe pile <br>"
This week a total of wall-cutting pouring completed, 10m3<br>"<br>"<br>This week total slope steel pipe pile: 142m, steel pipe pile construction completed "
This week, a total of 10 m3 cutoff wall pouring is completed.<br>"<br>"<br>Total steel pipe piles on the slope this week: 142m, and the construction of steel pipe piles has been completed.<br>"<br>