Condenser cooling pipe and accessories installed, steam side irrigation test, irrigation before all pipes connected to the condenser after a door installation closed or installed blocking plate, from the bottom of the condenser to 15.5m platform as a water level meter to observe the water level, the bottom of the condenser multi-ball support, the pipeline to do temporary support to prevent condenser deformation during the test , should be used not less than 15 degrees C chloride ion content of not more than 25 mg / L of water, irrigation height should be filled with the entire cooling pipe of the vapor side space, and higher than the condenser housing and neck weld 300mm, maintain 24 hours, should be no leakage, found leakage timely mark, steam side water release after treatment, and then re-test, until maintain 24 hours no leakage qualified.