If water needs are not met, according to the downstream water, the human dispatcher manually line scheduling correction reservoir and displacement FIG.
If the water demand is not met, the schedule line and drainage amount of the reservoir schedule map are artificially corrected according to the downstream water shortage.
If the water demand can not be met, the operation line and drainage volume of the reservoir operation diagram shall be manually corrected according to the water shortage in the downstream.<br>