At 10:10 a.m. on January 27, 2021, when Yang Chenlong inspected the water preparation room of building y61, he found that there was slight water leakage (secondary ro produced water) at the clamping joint of the pneumatic valve (v218.6.1) of purified water preparation produced water into purified water tank (b845.3.1).<br>Y61 purified water system secondary ro produced water pipeline support frame was broken after natural aging. When the secondary ro produced water, the pipeline was not fixed, and there was a large vibration. Frequent vibration led to the loose connection between pneumatic valve and pipeline, and eventually led to a slight leakage of secondary ro produced water, which belonged to natural aging of equipment.<br>
正在翻译中..