1. 安装前注意检查前一道压烫效果,每个热铆点需要到到位,不能漏烫。2. 装配时镜片的正反方向,液晶镜片有预留缺口装配方向。3. 垫片反光面的英语翻译

1. 安装前注意检查前一道压烫效果,每个热铆点需要到到位,不能漏烫。2

1. 安装前注意检查前一道压烫效果,每个热铆点需要到到位,不能漏烫。2. 装配时镜片的正反方向,液晶镜片有预留缺口装配方向。3. 垫片反光面朝壳内方向。4. 注意本工序半成品的镜片内侧保护膜在液晶装配前才能撕去,外侧保护膜在整机入包装盒时才能撕去,用以保护镜片,防止周转时外物对镜片产生划伤。5. 本工位必须悬挂产线当前在制产品的定制信息管控表,并依据定制信息管控表检查产品定制信息是否正确,避免物料错误。
0/5000
源语言: -
目标语言: -
结果 (英语) 1: [复制]
复制成功!
1. Before installation, pay attention to check the effect of the previous pressing. Each hot riveting point needs to be in place and not leaking. <br>2. The front and back direction of the lens when assembling, the liquid crystal lens has a pre-notch assembling direction. <br>3. The reflective surface of the gasket faces the inside of the shell. <br>4. Note that the inner protective film of the semi-finished lens in this process can be torn off before the liquid crystal is assembled, and the outer protective film can only be torn off when the whole machine is put in the packaging box to protect the lens and prevent foreign objects from scratching the lens during turnover. <br>5. This station must hang the customized information control table of the products currently in production on the production line, and check whether the product customization information is correct according to the customized information control table to avoid material errors.
正在翻译中..
结果 (英语) 2:[复制]
复制成功!
1. Before installation pay attention to check the previous hot effect, each hot riveting point needs to be in place, can not leak hot.<br>2. In the forward and opposite direction of the lenses at the time of assembly, the LCD lenses have a reserved gap assembly direction.<br>3. The reflective side of the gasket faces the inside of the shell.<br>4. Note that the inner protective film of the lens of the semi-finished product of this process can only be torn off before the liquid crystal assembly, and the outer protective film can only be torn off when the whole machine enters the box, in order to protect the lens and prevent scratches on the lens when the outer object is turned around.<br>5. This position must hang the custom information control table of the product currently under production line, and check whether the custom information of the product is correct according to the custom information control table to avoid material errors.
正在翻译中..
结果 (英语) 3:[复制]
复制成功!
1. Before installation, pay attention to check the effect of the previous pressing, and each hot riveting point needs to be in place without missing ironing.<br>2. The positive and negative directions of lens during assembly, and the assembly direction of LCD lens with reserved gap.<br>3. The reflective surface of the gasket faces the inside of the shell.<br>4. Note that the inner protective film of the semi-finished lens in this process can be removed before the liquid crystal assembly, and the outer protective film can only be removed when the whole machine is put into the packaging box to protect the lens and prevent the lens from being scratched by foreign objects during turnover.<br>5. The work station must hang the customized information control table of the current products in production line, and check whether the product customization information is correct according to the customized information control table, so as to avoid material errors.
正在翻译中..
 
其它语言
本翻译工具支持: 世界语, 丹麦语, 乌克兰语, 乌兹别克语, 乌尔都语, 亚美尼亚语, 伊博语, 俄语, 保加利亚语, 信德语, 修纳语, 僧伽罗语, 克林贡语, 克罗地亚语, 冰岛语, 加利西亚语, 加泰罗尼亚语, 匈牙利语, 南非祖鲁语, 南非科萨语, 卡纳达语, 卢旺达语, 卢森堡语, 印地语, 印尼巽他语, 印尼爪哇语, 印尼语, 古吉拉特语, 吉尔吉斯语, 哈萨克语, 土库曼语, 土耳其语, 塔吉克语, 塞尔维亚语, 塞索托语, 夏威夷语, 奥利亚语, 威尔士语, 孟加拉语, 宿务语, 尼泊尔语, 巴斯克语, 布尔语(南非荷兰语), 希伯来语, 希腊语, 库尔德语, 弗里西语, 德语, 意大利语, 意第绪语, 拉丁语, 拉脱维亚语, 挪威语, 捷克语, 斯洛伐克语, 斯洛文尼亚语, 斯瓦希里语, 旁遮普语, 日语, 普什图语, 格鲁吉亚语, 毛利语, 法语, 波兰语, 波斯尼亚语, 波斯语, 泰卢固语, 泰米尔语, 泰语, 海地克里奥尔语, 爱尔兰语, 爱沙尼亚语, 瑞典语, 白俄罗斯语, 科西嘉语, 立陶宛语, 简体中文, 索马里语, 繁体中文, 约鲁巴语, 维吾尔语, 缅甸语, 罗马尼亚语, 老挝语, 自动识别, 芬兰语, 苏格兰盖尔语, 苗语, 英语, 荷兰语, 菲律宾语, 萨摩亚语, 葡萄牙语, 蒙古语, 西班牙语, 豪萨语, 越南语, 阿塞拜疆语, 阿姆哈拉语, 阿尔巴尼亚语, 阿拉伯语, 鞑靼语, 韩语, 马其顿语, 马尔加什语, 马拉地语, 马拉雅拉姆语, 马来语, 马耳他语, 高棉语, 齐切瓦语, 等语言的翻译.

Copyright ©2024 I Love Translation. All reserved.

E-mail: