Two fixed traction points are set at the fixed position of excitation end of generator foundation, and two 2T chain hoists are hung for traction of 7000mm long box girder. The three box girders near the south end of the foundation are hoisted away by 50t truck crane first, and the remaining box girders are hauled to the south end of the foundation by chain block in turn, and then hoisted away by 50t truck crane one by one (in the process of hauling the box girder, yellow glycerin is smeared on the upper surface of the steel plate at the bottom of the box girder to reduce the friction between the box girder and the steel plate).
正在翻译中..