By studying the flood control dispatch of the plump reservoir and the time of blocking the storage of the Baishan reservoir, further optimize the original joint dispatch scheme of the flood control of the plump and White Mountain reservoirs, adjust the principle of the joint adjustment of the two reservoirs, so that the flood control capacity of the two reservoirs can be reasonably utilized, and the flood control function of the two reservoirs can be given full play.
正在翻译中..