The distance between the pipe bottom and the pit bottom is more than 500mm (the distance between the stonework section is more than or equal to 300mm), which must be carried out manually. When cleaning the soil above the welded junction, it must be cleaned manually. The anti collapse shed shall be placed under the operation pit or the operation pit shall be reinforced by piling and supporting. At both sides of the axial end of the welded junction, the pedestrian passage with a slope of less than 15 ° shall be excavated by machinery and labor along the axial direction. During the excavation of operation pit, in order to ensure the operation safety of the pipeline in service, the safety officer must be on site for supervision throughout the excavation process.