管底到坑底的距离大于500mm(石方段距离大于等于300mm),必须人工进行,在清理焊口上方土时,必须采用人工清理。操作坑下安置防塌棚或采用的英语翻译

管底到坑底的距离大于500mm(石方段距离大于等于300mm),必须人

管底到坑底的距离大于500mm(石方段距离大于等于300mm),必须人工进行,在清理焊口上方土时,必须采用人工清理。操作坑下安置防塌棚或采用打桩加支撑对操作坑进行加固,在焊口轴向一端两侧沿着轴向用机械和人工挖出坡度小于15°人行通道。操作坑开挖过程中,为确保在役管道的运行安全,开挖过程必须全程有安全员进行旁站监督。
0/5000
源语言: -
目标语言: -
结果 (英语) 1: [复制]
复制成功!
The distance from the bottom of the pipe to the bottom of the pit is greater than 500mm (the distance from the stone section is greater than or equal to 300mm), which must be carried out manually. When the soil above the weld is cleaned, manual cleaning must be used. Set up anti-collapse shed under the operation pit or use pile driving and support to reinforce the operation pit, and mechanically and manually excavate pedestrian passages with a slope of less than 15 ° along both sides of the axial end of the weld. During the excavation of the operation pit, in order to ensure the operation safety of the pipeline in service, a safety officer must supervise the whole station during the excavation process.
正在翻译中..
结果 (英语) 2:[复制]
复制成功!
The distance from the bottom of the tube to the bottom of the pit is greater than 500mm (the distance of the stone section is greater than or equal to 300mm), must be carried out manually, and manual cleaning must be used when cleaning the soil above the weld. Under the operation pit, the anti-collapse shed is placed or the operation pit is reinforced with piling and support, and the axial passage smaller than 15 degrees is excavated by mechanical and manual excavation of the slope by mechanical and manual excavation at both ends of the welding port. In order to ensure the safety of the operation of the operation of the operation of the operation pit, the excavation process must have the safety personnel to supervise the side station.
正在翻译中..
结果 (英语) 3:[复制]
复制成功!
The distance between the pipe bottom and the pit bottom is more than 500mm (the distance between the stonework section is more than or equal to 300mm), which must be carried out manually. When cleaning the soil above the welded junction, it must be cleaned manually. The anti collapse shed shall be placed under the operation pit or the operation pit shall be reinforced by piling and supporting. At both sides of the axial end of the welded junction, the pedestrian passage with a slope of less than 15 ° shall be excavated by machinery and labor along the axial direction. During the excavation of operation pit, in order to ensure the operation safety of the pipeline in service, the safety officer must be on site for supervision throughout the excavation process.
正在翻译中..
 
其它语言
本翻译工具支持: 世界语, 丹麦语, 乌克兰语, 乌兹别克语, 乌尔都语, 亚美尼亚语, 伊博语, 俄语, 保加利亚语, 信德语, 修纳语, 僧伽罗语, 克林贡语, 克罗地亚语, 冰岛语, 加利西亚语, 加泰罗尼亚语, 匈牙利语, 南非祖鲁语, 南非科萨语, 卡纳达语, 卢旺达语, 卢森堡语, 印地语, 印尼巽他语, 印尼爪哇语, 印尼语, 古吉拉特语, 吉尔吉斯语, 哈萨克语, 土库曼语, 土耳其语, 塔吉克语, 塞尔维亚语, 塞索托语, 夏威夷语, 奥利亚语, 威尔士语, 孟加拉语, 宿务语, 尼泊尔语, 巴斯克语, 布尔语(南非荷兰语), 希伯来语, 希腊语, 库尔德语, 弗里西语, 德语, 意大利语, 意第绪语, 拉丁语, 拉脱维亚语, 挪威语, 捷克语, 斯洛伐克语, 斯洛文尼亚语, 斯瓦希里语, 旁遮普语, 日语, 普什图语, 格鲁吉亚语, 毛利语, 法语, 波兰语, 波斯尼亚语, 波斯语, 泰卢固语, 泰米尔语, 泰语, 海地克里奥尔语, 爱尔兰语, 爱沙尼亚语, 瑞典语, 白俄罗斯语, 科西嘉语, 立陶宛语, 简体中文, 索马里语, 繁体中文, 约鲁巴语, 维吾尔语, 缅甸语, 罗马尼亚语, 老挝语, 自动识别, 芬兰语, 苏格兰盖尔语, 苗语, 英语, 荷兰语, 菲律宾语, 萨摩亚语, 葡萄牙语, 蒙古语, 西班牙语, 豪萨语, 越南语, 阿塞拜疆语, 阿姆哈拉语, 阿尔巴尼亚语, 阿拉伯语, 鞑靼语, 韩语, 马其顿语, 马尔加什语, 马拉地语, 马拉雅拉姆语, 马来语, 马耳他语, 高棉语, 齐切瓦语, 等语言的翻译.

Copyright ©2024 I Love Translation. All reserved.

E-mail: