C24 and C36 are conversion columns, and the first-level beams of B24 are not connected at present. It is recommended to widen the pull-through to provide strong constraints for the conversion columns on both sides
C24 and C36 are transfer columns, and the first floor beam of B24 is not connected at present. It is recommended to widen and pull through to provide strong constraints for transfer columns on both sides<br>