The newly developed operation diagram (as shown in Figure 4) is adopted for Fengman reservoir, and the preliminary operation diagram (as shown in Figure 5) is adopted for Nierji reservoir. The results show that the water demand of the river can be satisfied, but the shipping flow can not be fully satisfied. That is to say, the ecological flow of each section of Nenjiang River and the main stream of Songhua River in Harbin can be met, but the assurance rate of the shipping flow of Harbin section is 81%.<br>