2: For the steel structure analysis of overseas projects, re-determine the analysis method to meet the latest needs of customers. For the calculation and analysis of the steel structure of the Chile project (703342), in order to meet the needs of customers, the calculation report was refined and the calculation and analysis were performed again. The strength and stability of school team connecting bolts and welds in various working conditions (static load, temperature load, seismic load). Make it meet the design requirements.
正在翻译中..