The first station, G75-950, G100-500, G100-800, G100-850, G100-900, G101-200, G114-150 (into the station road), G116, G123 has been completed, and the total completion of the total progress is 100%; <br>G114, G118, G147-000, G147-230, G148-850: completed, the total completion of the total progress of 100%.<br>"1, G132,300: anti-slip pile to complete construction, drainage ditch to complete construction, the remaining new pile inter-stop bezel has not been done, no construction progress this week, the cumulative completion of the total progress of 98%; 2, G132 and 200: the old pile site pile inter-stopbeving completed construction, pile front PE membrane laying completed, drainage channel completed 30%, this week on-site treatment of anti-slip pile under the ground subsidence problem; for anti-slip piles to add simple observation facilities, no construction progress, the cumulative completion of the total progress of 70%. <br>" G110: Slope clean-up; this week 2- the 2-blocking wall base groove was poured 4.3m, completing a total of 36.3m. The cumulative total progress of the project is 79%.
正在翻译中..