按照“以车(设备)定运”原则,最大限度挖掘运输潜力,增加上线运能;同时,由各线路控制中心采取固定与灵活相结合的方式,充分利用列车资源,灵活科的英语翻译

按照“以车(设备)定运”原则,最大限度挖掘运输潜力,增加上线运能;同时

按照“以车(设备)定运”原则,最大限度挖掘运输潜力,增加上线运能;同时,由各线路控制中心采取固定与灵活相结合的方式,充分利用列车资源,灵活科学调度,缓解大客流车站的客运压力。行车组织措施主要有以下几点。3.4.1及时使用备用车控制中心根据现场客流情况,灵活安排备用车在高峰时段上线输运。备用车投人服务站点需结合车站客流、站台大小、是否是换乘站等因素综合考虑。3.4.2合理组织空客车受备用车数量限制,对高峰时段客流与运能矛盾异常突出的大客流车站,尤其是换乘站,控制中心可结合抽取终点站部分列车不载客直接运行到大客流车站投人服务的方式进行缓解。3.4.3灵活调整行车交路对于各区段客流不均衡的线路,可采用灵活调整部分列车行车交路方式,将部分列车经中间折返站折返小交路运行,加大高峰区段行车密度方式,疏导高峰区段客流。3.4.4组织列车越站运行对于换乘车站,在站台出现危及乘客人身安全的不可控局面时,控制中心可及时组织列车越站运行,避免因乘客下车对车站站台造成进一步冲击。由于列车越站对乘客服务影响较大,并且列车越站不能实际输运站台乘客,故非紧急情况下不建议采取该项措施。
0/5000
源语言: -
目标语言: -
结果 (英语) 1: [复制]
复制成功!
According to the "car (equipment) fixed Win" principle, to maximize the potential of mining transport, increase the transport capacity on the line; at the same time, by the control center to take the line fixed and flexible combination of resources to make full use of the train, scientific and flexible scheduling, great ease passenger traffic pressure station. Driving organizational measures following main points. <br>3.4.1 timely use spare car <br>control center passenger traffic according to the scene, Flexible backup transport lane on peak hours. Spare car investment service site requires a combination of passengers and trains, platform size, whether it is a transfer station and other factors into account. <br>3.4.2 rational organization of air passenger <br>by the number of spare car restrictions on rush hour traffic and transport capacity contradictory prominent exception of large passenger station, in particular, the transfer station, the control center can be combined to extract the terminal portion of the passenger train does not run directly to large way passenger station investment services be eased. <br>3.4.3 Flexible Routing traffic to adjust <br>for the segments uneven passenger lines, train operation portion can be flexibly adjusted Routing embodiment, the folded portion of the train station via an intermediate folded small cross-road running mode to increase the peak traffic density zone, ease the passenger flow peak section. <br>3.4.4 organize the train station to run <br>for the transfer station when the station appears endanger the safety of passengers uncontrollable situation, the control center can promptly organize the train station to run, to avoid causing further impact on passengers to get off the station platform. Due to the train station for passenger service a greater impact, the train station and not the actual passenger transport station, it is not recommended for non-emergency situations to take the measure.
正在翻译中..
结果 (英语) 2:[复制]
复制成功!
In accordance with the principle of "scheduled transportation by car (equipment) ", maximize the potential of transportation and increase on-line transportation capacity, at the same time, by the line control center to adopt a fixed and flexible combination of the way, make full use of train resources, flexible scientific scheduling, to alleviate the passenger pressure of large passenger stations. The following main measures are the following.<br>3.4.1 Timely use of spare vehicles<br>Control center according to the on-site passenger flow situation, flexible arrangements for backup vehicles in peak hours on-line transport. The backup vehicle investment service station needs to combine the station passenger flow, platform size, whether it is a transfer station and other factors to consider comprehensively.<br>3.4.2 Reasonable organization of air buses<br>Limited by the number of spare cars, the peak peak passenger flow and capacity contradictions are unusually prominent large passenger flow stations, especially transfer stations, the control center can be combined with the extraction of some of the terminal trains do not carry passengers directly to the large passenger flow station to the way to ease the delivery of services.<br>3.4.3 Flexible adjustment of traffic<br>For the uneven passenger flow of the various sections of the line, can be flexible adjustment of some train traffic mode, some trains through the middle back to the station back to small cross-road operation, increase the peak section of the traffic density mode, to divert the peak section of passenger flow.<br>3.4.4 Organization of trains to run across the station<br>For transfer stations, in the platform endangers the personal safety of passengers in an uncontrollable situation, the control center can timely organize the train to run across the station, to avoid passengers off the station caused further impact. This measure is not recommended in case of emergency because the crossing of the train has a greater impact on passenger service and the train crossing cannot actually transport passengers to the platform.
正在翻译中..
结果 (英语) 3:[复制]
复制成功!
According to the principle of "regular transportation by vehicle (equipment)", maximize the transportation potential and increase the online transportation capacity; at the same time, each line control center adopts a combination of fixed and flexible ways to make full use of the train resources, flexible and scientific scheduling, and ease the passenger pressure of the large passenger flow station. The driving organization measures mainly include the following points.<br>3.4.1 timely use of standby vehicle<br>The control center shall flexibly arrange standby vehicles for online transportation in peak hours according to the on-site passenger flow. The passenger flow of the station, platform size and whether it is a transfer station and other factors shall be taken into consideration.<br>3.4.2 reasonable organization of Airbus<br>Due to the limitation of the number of standby vehicles, the control center can alleviate the contradiction between the passenger flow and the transportation capacity in the peak period, especially in the transfer station, by combining the way of extracting some trains from the terminal station to directly run to the large passenger flow station without carrying passengers for human service.<br>3.4.3 flexible adjustment of traffic routing<br>For the lines with unbalanced passenger flow in each section, flexible adjustment can be adopted for the running routing mode of some trains. Some trains can turn back to the small routing operation through the intermediate turn back station, increase the traffic density mode in the peak section, and dredge the passenger flow in the peak section.<br>3.4.4 organize the train to cross the station<br>For transfer stations, in case of uncontrollable situation that endangers the personal safety of passengers on the platform, the control center can organize the train to cross the station in time to avoid further impact on the station platform caused by passengers getting off. This measure is not recommended in case of non emergency because the train overstepping has a great impact on passenger service, and the train overstepping cannot actually transport platform passengers.<br>
正在翻译中..
 
其它语言
本翻译工具支持: 世界语, 丹麦语, 乌克兰语, 乌兹别克语, 乌尔都语, 亚美尼亚语, 伊博语, 俄语, 保加利亚语, 信德语, 修纳语, 僧伽罗语, 克林贡语, 克罗地亚语, 冰岛语, 加利西亚语, 加泰罗尼亚语, 匈牙利语, 南非祖鲁语, 南非科萨语, 卡纳达语, 卢旺达语, 卢森堡语, 印地语, 印尼巽他语, 印尼爪哇语, 印尼语, 古吉拉特语, 吉尔吉斯语, 哈萨克语, 土库曼语, 土耳其语, 塔吉克语, 塞尔维亚语, 塞索托语, 夏威夷语, 奥利亚语, 威尔士语, 孟加拉语, 宿务语, 尼泊尔语, 巴斯克语, 布尔语(南非荷兰语), 希伯来语, 希腊语, 库尔德语, 弗里西语, 德语, 意大利语, 意第绪语, 拉丁语, 拉脱维亚语, 挪威语, 捷克语, 斯洛伐克语, 斯洛文尼亚语, 斯瓦希里语, 旁遮普语, 日语, 普什图语, 格鲁吉亚语, 毛利语, 法语, 波兰语, 波斯尼亚语, 波斯语, 泰卢固语, 泰米尔语, 泰语, 海地克里奥尔语, 爱尔兰语, 爱沙尼亚语, 瑞典语, 白俄罗斯语, 科西嘉语, 立陶宛语, 简体中文, 索马里语, 繁体中文, 约鲁巴语, 维吾尔语, 缅甸语, 罗马尼亚语, 老挝语, 自动识别, 芬兰语, 苏格兰盖尔语, 苗语, 英语, 荷兰语, 菲律宾语, 萨摩亚语, 葡萄牙语, 蒙古语, 西班牙语, 豪萨语, 越南语, 阿塞拜疆语, 阿姆哈拉语, 阿尔巴尼亚语, 阿拉伯语, 鞑靼语, 韩语, 马其顿语, 马尔加什语, 马拉地语, 马拉雅拉姆语, 马来语, 马耳他语, 高棉语, 齐切瓦语, 等语言的翻译.

Copyright ©2024 I Love Translation. All reserved.

E-mail: