5.1. Control, measurement, protection, signal circuit inspection and insulation tests.<br>5.1.1. According to the design requirements to check the control, measurement, protection signal circuit, cable correction corresponding to accurate, terminal fastening, mechanical part of the inspection is good.<br>5.1.2. Insulation and pressure resistance tests.<br>Using the 500V MO meter measurement, its insulation resistance value should be greater than 1Mω, the ground frequency 1000V pressure resistance test is only carried out on the control circuit, the duration of 1 minute; <br>5.2. Device unit component adjustment, adjustment test.<br>The setting of the corresponding control and protection parameters within the diesel engine intelligent controller is set by the diesel engine manufacturer and provided to the power plant for confirmation before it can be put into use. <br>5.3. Diesel generator set a equipment handover test.<br>5.3.1. Generator test;<br>5.3.2. Measuring the insulation resistance of the sernut windings;<br>5.3.3. Measuring the DC resistance of the synth winding;<br>5.3.4. Senth winding AC pressure test;<br>5.3.5. Measure phase sequence, motor terminal label should be consistent with phase sequence;<br>5.3.6. Diesel generator outlet bus insulation test.
正在翻译中..