排水沟浇筑80m,桩间挡板混凝土浇筑完成62块,5#-6#防冲墙下至1#淤土坝前的钢管桩钻孔、下管共610根,桩前钢管桩下管320根N1累计的英语翻译

排水沟浇筑80m,桩间挡板混凝土浇筑完成62块,5#-6#防冲墙下至1

排水沟浇筑80m,桩间挡板混凝土浇筑完成62块,5#-6#防冲墙下至1#淤土坝前的钢管桩钻孔、下管共610根,桩前钢管桩下管320根N1累计完成开挖桩长14.20米,桩芯混凝土浇筑完成;N3累计完成开挖桩长15.60米,桩芯混凝土浇筑完成; N4累计完成开挖桩长15.4米。N2累计13.0米;N5累计16.6米;N6累计16.0米;N7累计16.1米;N8累计13.5米,N9累计14.9米;N10累计15米。1#淤土坝混凝土浇筑完成
0/5000
源语言: -
目标语言: -
结果 (英语) 1: [复制]
复制成功!
Drains pouring 80m, between the pile concrete pouring is completed the shutter 62, the drill steel pipe pile # 5 # -6 front wall to scour # 1 silt dam, the total tube 610, a lower front pile steel pipe pile tube 320 <br>N1 excavation accumulated pile length 14.20 m, the pile core concrete pouring is completed; N3 accumulated excavation 15.60 meters long pile, pouring concrete pile is completed core; N4 accumulated pile length 15.4 m excavation. Total 13.0 m N2; N5 total 16.6 m; total 16.0 m N6; N7 total 16.1 m; total 13.5 m N8, N9 total 14.9 m; 15 m total N10. 1 # silt dam concrete pouring is completed
正在翻译中..
结果 (英语) 2:[复制]
复制成功!
Drainage ditch pouring 80m, pile-to-be concrete pouring completed 62 blocks, 5-6 s anti-flush wall down to 1 s mud dam before the steel pipe pile drilling, the lower pipe a total of 610, the pile front steel pipe pile under the pipe 320 N1 completed a total of 14.20 meters of excavation pile length, pile core concrete pouring completed, N3 completed the excavation pile length of 15.60 meters, pile core concrete pouring completed, N4 completed the completion of the excavation pile length of 15.4 meters. N2 accumulated 13.0 meters; N5 accumulated 16.6 meters; N6 accumulated 16.0 meters; N7 accumulated 16.1 meters; N8 accumulated 13.5 meters, N9 accumulated 14.9 meters; N10 accumulated 15 meters. 1- Concrete pouring of silt dam completed
正在翻译中..
结果 (英语) 3:[复制]
复制成功!
80m for drainage ditch, 62 pieces of baffle concrete between piles have been poured, 610 steel pipe piles have been drilled and lowered from 5 × 6 × anti scour wall to 1 × silt dam, and 320 steel pipe piles have been lowered.<br>In N1, the total length of excavated pile is 14.20 meters, and the concrete pouring of pile core is completed; in N3, the total length of excavated pile is 15.60 meters, and the concrete pouring of pile core is completed; in N4, the total length of excavated pile is 15.4 meters. N2: 13.0m; N5: 16.6m; N6: 16.0m; N7: 16.1m; N8: 13.5m; N9: 14.9m; N10: 15m. 1. Completion of concrete pouring of silt dam<br>
正在翻译中..
 
其它语言
本翻译工具支持: 世界语, 丹麦语, 乌克兰语, 乌兹别克语, 乌尔都语, 亚美尼亚语, 伊博语, 俄语, 保加利亚语, 信德语, 修纳语, 僧伽罗语, 克林贡语, 克罗地亚语, 冰岛语, 加利西亚语, 加泰罗尼亚语, 匈牙利语, 南非祖鲁语, 南非科萨语, 卡纳达语, 卢旺达语, 卢森堡语, 印地语, 印尼巽他语, 印尼爪哇语, 印尼语, 古吉拉特语, 吉尔吉斯语, 哈萨克语, 土库曼语, 土耳其语, 塔吉克语, 塞尔维亚语, 塞索托语, 夏威夷语, 奥利亚语, 威尔士语, 孟加拉语, 宿务语, 尼泊尔语, 巴斯克语, 布尔语(南非荷兰语), 希伯来语, 希腊语, 库尔德语, 弗里西语, 德语, 意大利语, 意第绪语, 拉丁语, 拉脱维亚语, 挪威语, 捷克语, 斯洛伐克语, 斯洛文尼亚语, 斯瓦希里语, 旁遮普语, 日语, 普什图语, 格鲁吉亚语, 毛利语, 法语, 波兰语, 波斯尼亚语, 波斯语, 泰卢固语, 泰米尔语, 泰语, 海地克里奥尔语, 爱尔兰语, 爱沙尼亚语, 瑞典语, 白俄罗斯语, 科西嘉语, 立陶宛语, 简体中文, 索马里语, 繁体中文, 约鲁巴语, 维吾尔语, 缅甸语, 罗马尼亚语, 老挝语, 自动识别, 芬兰语, 苏格兰盖尔语, 苗语, 英语, 荷兰语, 菲律宾语, 萨摩亚语, 葡萄牙语, 蒙古语, 西班牙语, 豪萨语, 越南语, 阿塞拜疆语, 阿姆哈拉语, 阿尔巴尼亚语, 阿拉伯语, 鞑靼语, 韩语, 马其顿语, 马尔加什语, 马拉地语, 马拉雅拉姆语, 马来语, 马耳他语, 高棉语, 齐切瓦语, 等语言的翻译.