经动测捡测,发现的疑问的工程桩,经静压验证,在最大试验荷载下,疑问桩的50%桩端的岩芯呈块状~柱状,未达到极限端阻力,具有较大潜力;20%的的英语翻译

经动测捡测,发现的疑问的工程桩,经静压验证,在最大试验荷载下,疑问桩的

经动测捡测,发现的疑问的工程桩,经静压验证,在最大试验荷载下,疑问桩的50%桩端的岩芯呈块状~柱状,未达到极限端阻力,具有较大潜力;20%的桩端的岩芯呈碎状~块状,已接近极限端阻力,但比规范计算值高22.7%;10%的桩端的岩体夹有软弱层被冲剪破坏;20%工程桩因施工质量问题被作废桩处理。
0/5000
源语言: -
目标语言: -
结果 (英语) 1: [复制]
复制成功!
After dynamic testing, the suspected engineering piles were discovered and verified by static pressure. Under the maximum test load, the core of 50% of the pile tip of the suspected piles was block-columnar, which did not reach the limit end resistance, which has great potential; The core of 20% of the pile tip is broken to block, which is close to the limit end resistance, but 22.7% higher than the value calculated by the specification; 10% of the pile tip has a weak layer in the rock mass and is damaged by punching shear; 20% of the engineering pile The construction quality problems were treated as waste piles.
正在翻译中..
结果 (英语) 2:[复制]
复制成功!
After dynamic testing and testing, found the project pile of doubt, verified by static pressure, under the maximum test load, the core of 50% of the pile of doubt is block-pillar, did not reach the limit end resistance, with greater potential; It is fragmented to block, which is close to the limit end resistance, but is 22.7% higher than the standard calculation value, 10% of the rock body at the end of the pile is clamped with weak layers that are cut and destroyed, and 20% of the piles are treated as waste piles due to construction quality problems.
正在翻译中..
结果 (英语) 3:[复制]
复制成功!
According to the dynamic test and static pressure verification, 50% of the core at the pile tip of the suspected pile is massive to columnar under the maximum test load, which does not reach the ultimate end resistance, so it has great potential; 20% of the core at the pile end is fragmentary to massive, which is close to the ultimate end resistance, but 22.7% higher than the calculation value in the specification; 10% of the rock mass at the pile end is mixed with weak layer, which is destroyed by punching and shearing; 20 %Due to the construction quality problems, the engineering piles are abandoned.<br>
正在翻译中..
 
其它语言
本翻译工具支持: 世界语, 丹麦语, 乌克兰语, 乌兹别克语, 乌尔都语, 亚美尼亚语, 伊博语, 俄语, 保加利亚语, 信德语, 修纳语, 僧伽罗语, 克林贡语, 克罗地亚语, 冰岛语, 加利西亚语, 加泰罗尼亚语, 匈牙利语, 南非祖鲁语, 南非科萨语, 卡纳达语, 卢旺达语, 卢森堡语, 印地语, 印尼巽他语, 印尼爪哇语, 印尼语, 古吉拉特语, 吉尔吉斯语, 哈萨克语, 土库曼语, 土耳其语, 塔吉克语, 塞尔维亚语, 塞索托语, 夏威夷语, 奥利亚语, 威尔士语, 孟加拉语, 宿务语, 尼泊尔语, 巴斯克语, 布尔语(南非荷兰语), 希伯来语, 希腊语, 库尔德语, 弗里西语, 德语, 意大利语, 意第绪语, 拉丁语, 拉脱维亚语, 挪威语, 捷克语, 斯洛伐克语, 斯洛文尼亚语, 斯瓦希里语, 旁遮普语, 日语, 普什图语, 格鲁吉亚语, 毛利语, 法语, 波兰语, 波斯尼亚语, 波斯语, 泰卢固语, 泰米尔语, 泰语, 海地克里奥尔语, 爱尔兰语, 爱沙尼亚语, 瑞典语, 白俄罗斯语, 科西嘉语, 立陶宛语, 简体中文, 索马里语, 繁体中文, 约鲁巴语, 维吾尔语, 缅甸语, 罗马尼亚语, 老挝语, 自动识别, 芬兰语, 苏格兰盖尔语, 苗语, 英语, 荷兰语, 菲律宾语, 萨摩亚语, 葡萄牙语, 蒙古语, 西班牙语, 豪萨语, 越南语, 阿塞拜疆语, 阿姆哈拉语, 阿尔巴尼亚语, 阿拉伯语, 鞑靼语, 韩语, 马其顿语, 马尔加什语, 马拉地语, 马拉雅拉姆语, 马来语, 马耳他语, 高棉语, 齐切瓦语, 等语言的翻译.

Copyright ©2024 I Love Translation. All reserved.

E-mail: