1. MES part: 12 / 27 ~ 12 / 8, according to Brazil's PE tairo reply, MES has completed Mn download, BT test, PN / Sn download, real case label (box label), Sn check site; the remaining LCT and AOI of MES part have not been completed, what is LCT? If the ICT is not completed, when is it expected to be completed?<br>2. Please confirm with Brazil whether leakage current and package label have been completed.<br>