7) The basic idea of new products and the idea of using advanced technology and the problems with the current system:<br>8) New product piloting and key technical issues and risk analysis;<br>9) The general schedule of new product development;<br>10) Estimated annual output, cost estimates, and price budgets for new products:<br>11) Investment budget (including: personnel investment, facilities/equipment investment, etc.)<br>12) Sales channels and more:<br>13) Turn customer voices into measurable design goals, including cost goals, quality goals, process capability goals, and productivity goals. 14) Assessment findings.<br>(New Product Project Feasibility Report) 6.1.5 The multi-functional team details the progress of new product development.<br>(APQP Development Plan for New Product Projects) 6.1.6 Develop the initial bill of materials required to manufacture the product on the basis of the product/process. <br>(Initial List of Materials); 6.1.7 The initial process flowchart is determined based on the initial bill of materials and the assumption of the customer's product/process.<br>(Initial Process Flow Chart, Process Flow Chart Checklist); 6.1.8 Prepare a list of product and process-specific characteristics based on the particularity of the products and processes specified by the customer and the experience of past product development.<br>Identification of special features can be identified from the following aspects: 1) safety, environmental protection requirements, 2) performance, structural requirements, 3) material performance requirements, 4) dimensional tolerances, 5) appearance, 6) packaging, transportation, etc. At this stage, the team should ensure that an initial schedule of the characteristics of the special product and process derived from the analysis of the inputs related to the customer's needs and expectations is developed. <br>The schedule is based on( but not limited to) product assumptions based on customer needs and expectations analysis, 2) reliability objectives/requirements, 3) specific process characteristics from the expected manufacturing process, and 4) failure patterns and consequence analysis of similar parts.<br>Among them: Key features: exceeding the prescribed limits caused by the product's safety, regulatory compliance, or product loss of full functionality. Important features: Exceeding the specified limits causes the product to lose functionality, with secondary effects: a slight impact on product performance, even if the specified limits are exceeded. (List of Special Features of Products and Processes)
正在翻译中..