Technology Division is responsible for reviewing the status of the device installation and commissioning of the trial, along with "equipment installation record" into the "equipment acceptance report"
The Process Section is responsible for reviewing the installation and commissioning of equipment trial, together with the Equipment Installation and Commissioning Record into the "Equipment Acceptance Report"
The process department is responsible for reviewing the installation, commissioning and trial use of the equipment and incorporating the equipment installation and commissioning record into the equipment acceptance report<br>