If both reservoirs use a modified schedule map, the water resources are scheduled (as shown in Figures 4 and 6). The analysis of water supply and demand shows that the water demand of the river can be satisfied, but the shipping flow can not be fully satisfied. That is, the Nenjiang, the second Songhua River section and the Songhua River main stream Harbin section ecological flow can be satisfied, but Harbin section shipping flow guarantee rate can only reach 90%.
正在翻译中..