The plant installation room is poured to EL.582m, concrete is poured to 1016m³, and the slope system on both sides is anchored and shotcretely supported;
The concrete in the plant installation room is poured to El 582m, concrete pouring 1016m ³, Bolting and shotcrete support of slope system on both sides;
The concrete pouring in the workshop is up to EL.582m, the concrete pouring is 1016m³, and the side slope systems are supported by bolting and shotcreting.