(1) There is a risk of fault control;<br>1, daily maintenance and inspection reports<br>2, machine installation induction, alarm system (Figure 5)<br>(2) SPC control for each machine;<br>1, cutting speed, tension, wind speed SPC report <br>(3) The equipment and the tool do not correspond, how to determine the influencing factors?<br>1, Class A tool docking Class A corresponding machine, B-type tool docking B-class corresponding machine, Class C tool docking C corresponding machine (Figure 1)<br>2, ERP system control (Figure 2)<br>3, tool scan (Figure 3)
正在翻译中..