5. Qualifications and training requirements <br>5.1 The training requirements of relevant personnel shall be implemented in accordance with the staff training procedures. <br>6. Content <br>6.1 In order to control and effectively improve the process, it is necessary to establish a product quality core group with the participation of personnel from multiple departments, and use all useful information (such as process flow diagrams, FMEA, special features, design reviews, etc.) Have a good understanding of the process to formulate the "Control Plan (QC Engineering Drawing)" <br>6.2 Refer to the supplementary "Control Plan (QC Engineering Drawing) Checklist" in the APQP manual for the results of the "Control Plan (QC Engineering Drawing)" Review conducted. It is helpful to describe the control measures required at each stage of the production process more completely. <br>6.3 [Control Plan (QC Engineering Drawing)] Column Description <br>6.3.1 Prototype, Trial Production, Production Representation Appropriate classification description of the product status: Sample— Dimensional measurement, material and performance test carried out in the prototype stage: trial production-size measurement, material and performance test carried out in trial production after the prototype is completed: production-in formal production, product and process characteristics, process control, test and comprehensive documentation of the measurement system described in <br>6.3.2 control plan (QC drawings) number if required, fill control program (QC drawings) number for traceability, control plan for multiple pages (QC drawing) is filled Enter page number (such as the first page has one page)
正在翻译中..