Camp site leveling according to 50cm backfill, 15cm basic consideration, camp site area according to 60m x 60m consideration. The balance of earthwork in the field area should be properly graded, the drainage of the field should be considered in an integrated manner, the drainage ditches should be set up around the camp, and the drainage ditches should be connected to the drainage facilities outside the field area to ensure the smooth drainage.
正在翻译中..