1. The flow switch is installed on a section of straight pipe, with a straight length of at least 5 times the pipe diameter on both sides.<br>2. The flow switch should be installed in the horizontal pipe or vertical pipe with the liquid flow direction upward, but not in the pipe with the liquid flow downward. When installed in the pipeline with liquid flow direction, the influence of gravity should be considered, and the flow switch should be adjusted to slightly higher than the standard flow value.<br>3. The flow sheet is sent out with the packing box and installed on the one inch pipeline, and one inch target is installed. If it is used on the two inch pipeline, one inch and two inch target pieces need to be installed at the same time, and so on.<br>4. The installation diagram is as follows.<br>
正在翻译中..