The crane can only be loosened when the steel column is upright and stable. After the crane is loosened, the construction personnel shall swing the hemp rope connected with the shackle within the safety range to loosen the sling. After loosening, the sling will slide down, slide down to the ground and remove.<br>
正在翻译中..