按照《预冲式冲管注射器吸塑包装标准操作规程》进行操作,选取目前有效的工艺参数范围的最大值、最小值及中间值三组参数,每组参数作为一个试验组,进的英语翻译

按照《预冲式冲管注射器吸塑包装标准操作规程》进行操作,选取目前有效的工

按照《预冲式冲管注射器吸塑包装标准操作规程》进行操作,选取目前有效的工艺参数范围的最大值、最小值及中间值三组参数,每组参数作为一个试验组,进行样品试验。首先设定选取的参数,将设备预热至目标温度,维持5-10分钟直至温度完全稳定,然后进行下膜的成型试验。试验过程中由技术部门做试验数据记录,质量部门进行抽样并对每组试验样品进行泡罩外观的检验,并填写附表二《吸塑包装工艺验证——泡罩预成型外观检验记录》、附表三《吸塑包装工艺验证——泡罩成型外观检验记录》。
0/5000
源语言: -
目标语言: -
结果 (英语) 1: [复制]
复制成功!
Operate in accordance with the "Standard Operating Procedures for Pre-flushing Syringe Blister Packaging", select the maximum, minimum and intermediate values ​​of the current valid process parameter range, and each group of parameters is used as a test group for sample testing. First set the selected parameters, preheat the equipment to the target temperature, maintain it for 5-10 minutes until the temperature is completely stable, and then perform the film forming test. During the test, the technical department will record the test data, and the quality department will sample and inspect the appearance of the blister for each group of test samples, and fill in the attached table 2 "Blister Packaging Process Verification-Blister Preform Appearance Inspection Record", Attached Table 3 "Blister Packaging Process Verification-Blister Forming Appearance Inspection Record".
正在翻译中..
结果 (英语) 2:[复制]
复制成功!
In accordance with the "pre-flush punch syringe ptister packaging standard operating procedures", select the current effective process parameter range of the maximum, minimum and median three sets of parameters, each set of parameters as a test group, sample test. First set the selected parameters, warm up the device to the target temperature, maintain 5-10 minutes until the temperature is completely stable, and then carry out the next membrane molding test. During the test process by the technical department to do test data records, the quality department to sample and each set of test samples for the appearance of the bubble cover inspection, and fill in the schedule two "blister packaging process verification - bubble pre-molded appearance inspection record", schedule three "blister packaging process verification - bubble molding appearance inspection record."
正在翻译中..
结果 (英语) 3:[复制]
复制成功!
According to the "standard operating procedures for blister packaging of pre impact flushing syringe", three groups of parameters including maximum, minimum and intermediate value in the range of effective process parameters are selected, and each group of parameters is taken as a test group for sample test. First, set the selected parameters, preheat the equipment to the target temperature, maintain for 5-10 minutes until the temperature is completely stable, and then conduct the molding test of the film. During the test, the technical department shall record the test data, the quality department shall take samples and inspect the appearance of blister for each group of test samples, and fill in the attached table 2 "blister packaging process verification - blister preform appearance inspection record", and Annex 3 "blister packaging process verification - blister forming appearance inspection record".<br>
正在翻译中..
 
其它语言
本翻译工具支持: 世界语, 丹麦语, 乌克兰语, 乌兹别克语, 乌尔都语, 亚美尼亚语, 伊博语, 俄语, 保加利亚语, 信德语, 修纳语, 僧伽罗语, 克林贡语, 克罗地亚语, 冰岛语, 加利西亚语, 加泰罗尼亚语, 匈牙利语, 南非祖鲁语, 南非科萨语, 卡纳达语, 卢旺达语, 卢森堡语, 印地语, 印尼巽他语, 印尼爪哇语, 印尼语, 古吉拉特语, 吉尔吉斯语, 哈萨克语, 土库曼语, 土耳其语, 塔吉克语, 塞尔维亚语, 塞索托语, 夏威夷语, 奥利亚语, 威尔士语, 孟加拉语, 宿务语, 尼泊尔语, 巴斯克语, 布尔语(南非荷兰语), 希伯来语, 希腊语, 库尔德语, 弗里西语, 德语, 意大利语, 意第绪语, 拉丁语, 拉脱维亚语, 挪威语, 捷克语, 斯洛伐克语, 斯洛文尼亚语, 斯瓦希里语, 旁遮普语, 日语, 普什图语, 格鲁吉亚语, 毛利语, 法语, 波兰语, 波斯尼亚语, 波斯语, 泰卢固语, 泰米尔语, 泰语, 海地克里奥尔语, 爱尔兰语, 爱沙尼亚语, 瑞典语, 白俄罗斯语, 科西嘉语, 立陶宛语, 简体中文, 索马里语, 繁体中文, 约鲁巴语, 维吾尔语, 缅甸语, 罗马尼亚语, 老挝语, 自动识别, 芬兰语, 苏格兰盖尔语, 苗语, 英语, 荷兰语, 菲律宾语, 萨摩亚语, 葡萄牙语, 蒙古语, 西班牙语, 豪萨语, 越南语, 阿塞拜疆语, 阿姆哈拉语, 阿尔巴尼亚语, 阿拉伯语, 鞑靼语, 韩语, 马其顿语, 马尔加什语, 马拉地语, 马拉雅拉姆语, 马来语, 马耳他语, 高棉语, 齐切瓦语, 等语言的翻译.

Copyright ©2024 I Love Translation. All reserved.

E-mail: