Supplier Risk Assessment <br>7.10.1 Objective: To identify the supplier risk, and graded, then according to the size of the risk level of supplier quality, supplier management, with a focus on strengthening <br>supplier management a high degree of risk. <br>7.10.2 Definition: Supplier Quality risk level is divided into A / B / C / D four and so on. A- low risk (more than 90 minutes), B- risk is small (80-90 minutes), C- <br>risk (60-79 minutes), D- risk large (below 60) <br>7.10.3 according to the supplier risk assessment summary table, to assess the following: <br>(1) the risk transfer contract Jia <br>(2) ability to pay suppliers <br>(3) supplier management system <br>(4) supplier delivery and delivery capacity <br>(5) vendor design capacity <br>(6) market continuity planning (contingency plans) <br>(7) the quality of delivery stability <br>7.10.4 for A grade, B grade supplier to retain qualified supplier qualification for the C grade, D grade single supplier gradually reduced, increasing the frequency of testing materials or even cancel its qualified supplier qualification
正在翻译中..