The internal pipe network system of 13 communities was reconstructed for 29.83km; Reconstruction and construction of 8 sewage collection pipe networks and rainwater pipe networks in the urban area of 3.9 km; restoration of the West Third Road and Century Avenue sewage pipeline, the pipeline desilting length of 5.95km, the sewage inspection well painting and reinforcement, cover replacement; caomagang road connecting Yuting North Avenue and Poyang Lake Avenue, the whole pipeline desilting; sporadic sewage connection project, new reinforced winding pipe 19.05 km.<br>