For the purpose of ensuring that the project starts as soon as possible, we will consider whether to submit the construction drawing design documents in stages according to the specific time requirements of the start, such as providing site excavation drawings and foundation construction drawings in advance. <br><br><br>If the construction drawing design can be started immediately after the FIA completes the preliminary design, we will be able to provide the first batch of drawings of the project site construction work in a relatively short time.
正在翻译中..