If the results of Party B’s performance have been inspected by Party A or have defects, Party A may request Party B to correct it within __ days (the time shall be determined by the chief inspector if Party A does not fill in). For those who fail to make corrections within the time limit, the overdue penalty shall be calculated in accordance with the provisions of Article 13 for delayed performance. However, those who have not corrected within the original contract performance period shall not be subject to this limit.